ZonePillar for engineering firms

A review inbox for the RFIs and submittals your GC routes to you.

Receive the items routed to your discipline, review the documents, and respond with your stamp. Every exchange is a tracked thread.

Submittal for review

2026-04, Variable frequency drives

From
Apex Mechanical
Through
Meridian GC
Discipline
Mechanical
Due
Sep 26
Approved as noted, stamped

A transmittal inbox, not another project system

Engineering firms work on desktop and tablet with a focused console: the inbox, connections, members, company chat and notifications.

  • Accept a GC's invitation by email
  • One inbox across every GC you work with
  • Nothing to set up on the project side

Inbox

Northline Engineering, Mechanical

  • Submittal 2026-04, VFDs

    Meridian GC, due Sep 26

    To review
  • RFI-014, Conflict at C-4

    Meridian GC, due Sep 24

    To answer
  • Submittal 2026-03, Rooftop unit

    Harbor Builders

    Stamped

Review, respond and stamp

Read the documents and every previous revision, log your response, and stamp it. The GC and the sub see it at once.

  • Every revision kept with its response
  • Standard review responses
  • Your stamp on the record

Review

RFI-014, Conflict at grid C-4

Asked by
Apex Mechanical
Answer
Reroute the duct below the beam; see sketch SK-07.
Answered, sent to the GC

See it on one of your own projects.

Bring a job you know well, its drawings, its crew and its paperwork, and see it in ZonePillar.

Decorative grid background

Ready to Transform Your Construction Management?

Book a walkthrough with our team. We set up your first project with you and train your crew to run it.

Copyright © 2026 ZonePillar, All Rights Reserved